What Battery Is Used for Telecom Towers?

Telecom BatteryLiFePO4Backup Power

Most telecom towers run on a -48V DC plant backed by batteries. Historically sealed lead-acid (VRLA) did the job; today 48V LiFePO4 battery packs are the standard upgrade for longer life, less weight and lower total cost.

The Short Answer

A telecom tower (BTS / base transceiver station) is powered by a -48V DC distribution plant, and the batteries sit on that bus to ride through grid outages and the gaps between generator starts. The two chemistries you will meet are:

Most new builds and retrofits now specify 48V LiFePO4.

Why Telecom Uses -48V, Not +48V

The -48V standard comes from old telephone-exchange practice: a positive-grounded 48V bus is safer for technicians and resists galvanic corrosion. The batteries are therefore a string of cells whose terminal voltage sits around -48V nominal. In a LiFePO4 pack that is 16 cells in series (16S): 16 × 3.2V = 51.2V at full charge, ~48V working.

VRLA vs LiFePO4 in a Cell Site

See the detailed comparison in our LiFePO4 vs lead-acid for telecom guide and the broader LiFePO4 vs VRLA battery article.

How Big Is a Tower Battery?

A typical macro BTS load is 1–5 kW. At -48V that is roughly 20–100A. A common configuration is a 48V 100Ah–200Ah LiFePO4 pack (5–10 kWh) sized for 4–10 hours of backup before the generator or grid returns. Remote and off-grid sites add solar and larger banks.

What XGW Supplies

We build 16S 48V telecom LiFePO4 packs in rack-mount or outdoor cabinets, with a telecom-grade BMS (RS485 / CAN, dry-contact alarm) and UL / CE / CB where required. Read the 48V telecom battery guide or see a deployed telecom battery project.

Browse the Telecom Battery range, or request a quote for OEM sizing.

FAQ

Can a telecom tower run on grid power alone?

No. The batteries are the ride-through energy between a grid failure and generator start, and the sole backup for off-grid sites.

Is 48V LiFePO4 safe in a cabinet?

Yes. LiFePO4 is thermally stable and a BMS monitors every cell; the cabinet still needs ventilation and fire separation per local code.

Related Products

More Reading

Need a Custom Power Solution?

37 senior R&D engineers. OEM/ODM from 500 units. Samples in 3-7 days.

Get a Quote WhatsApp Us